Customer Story: Omega Construction

There are time savings not only on the frontend, when we’re importing data, but also on the backend when we don’t have to correct mistakes that we otherwise might have made through manual entry.
— Greg Marshall, CFO, Omega Construction

About Omega Construction

Since 1975, Omega Construction has provided pre-construction and construction services to a variety of industries, including hospitality, retail, industrial and distribution, historic preservation, and commercial.

Omega employees wear safety gear on a job site

The challenge: accelerate daily log completion and replace Excel spreadsheets

Omega Construction needed a way to get better, more timely, and more consistent data from its project sites. Specifically, accelerate the completion and processing of daily logs while elevating the quality of input data. Sought to replace Excel spreadsheets with more versatile, efficient, and easier-to-use mobile forms.

The solution: pre-populated digital logs and real-time data access

With GoFormz, Omega Construction digitized their project daily logs so they could be instantly populated with highly accurate project data based on Drop Down menu selections. With real-time access to completed daily logs, back-office employees could significantly streamline the processing of log and payroll data, saving several hours each week.'

Results:

  • Drop Down menu selections instantly populate multiple fields on the form from Omega’s ERP software, resulting in more accurate data collection, the elimination of redundant data entry, and faster form completion

  • More accurate data and streamlined reporting saves several administrative hours per week

  • Form logic enables additional form fields to dynamically become visible in response to input data and field selections, guiding data entry

  • Digital data allows for more precise reporting on specific project data (e.g. rainfall totals)

  • Image fields allow users to input photos directly into digital forms, improving management’s visibility into job site activities

To learn more about Omega Construction’s digital transformation with GoFormz, read the full case study here.